Critical Path Analysis in Practice

Collected papers on project control

Specificaties
Paperback, 166 blz. | Engels
Taylor & Francis | 1e druk, 2013
ISBN13: 9780415852975
Rubricering
Taylor & Francis 1e druk, 2013 9780415852975
€ 74,41
Levertijd ongeveer 11 werkdagen
Gratis verzonden

Samenvatting

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Specificaties

ISBN13:9780415852975
Taal:Engels
Bindwijze:Paperback
Aantal pagina's:166
Druk:1
€ 74,41
Levertijd ongeveer 11 werkdagen
Gratis verzonden

Rubrieken

    Personen

      Trefwoorden

        Critical Path Analysis in Practice